Allocate unmetered electricity fairly and transparently—and reconcile back to the building total every time.
By the end of this bundle you will:
60–90 minutes
One building for one period
2–4 weeks
Standardize across a portfolio (priority buildings first)
Minimum:
Recommended:
Before you allocate, confirm:
Beginner rule: Most allocation errors are period mismatches and missing tenants.
If remainder is negative: stop and troubleshoot (period mismatch, data error, wrong meter, wrong tenant list)
Default method: area-weighted
Alternative bases (only if defensible and documented):
Use the Allocation Rule Calculator to produce:
Acceptable reconciliation difference: small rounding differences (define tolerance, e.g., <0.5% or <100 kWh). Anything larger should be investigated.
Create a one-page memo per building/period that states:
Allocation is not "set and forget." Each month:
↓ See templates section below
Allocation Memo (Internal) Building: Period: Building total kWh (evidence link): Submetered tenants included (list or link): Unmetered tenants included (list or link): Allocation method: - Basis used (area/headcount/custom): - Why this basis is used: - Common area treatment (included/excluded): Reconciliation: - Building total kWh: - Sum measured tenant kWh: - Remainder allocated kWh: - Sum tenant attributed kWh: - Difference (kWh and %): - Tolerance applied: Known limitations: - Missing tenant data: - Proxy/estimated components: - Period alignment notes: Prepared by: Reviewed by: Date:
| Tenant | Measured kWh (if submetered) | Basis value (area) | Share of remainder (%) | Allocated kWh | Total attributed kWh | Evidence/notes |
|---|---|---|---|---|---|---|
| — | — | — | — | — | — | — |
| Building total kWh | Sum measured kWh | Remainder kWh | Sum allocated kWh | Sum total attributed kWh | Difference (kWh) | Difference (%) | Status |
|---|---|---|---|---|---|---|---|
| — | — | — | — | — | — | — | — |
Allocation QA Checklist Period alignment - Building total and tenant data cover the same period (or difference documented) Population - All tenants included (either submetered or unmetered) - Basis values exist for all unmetered tenants Integrity - No duplicates - No negative kWh Reconciliation - Difference within tolerance - Rounding method documented Documentation - Allocation memo completed - Evidence links stored and valid - Change log updated if method changed
| Date | Building | Period | Change type | What changed | Why | Approved by | Evidence link |
|---|---|---|---|---|---|---|---|
| — | — | — | — | — | — | — | — |
Change type options: